Jean-Paul Sablerolle — Programme Director
Programme Director  ·  Critical Infrastructure  ·  Maastricht

Jean-PaulSablerolle

I work in environments where
failure is not a planning scenario.

30 years  ·  Every sector  ·  Every level of escalation

Continue

What I do is not complicated to describe: keep the programme running, keep the deadline, keep the organisation operational while the change happens around it.

For thirty years I have delivered IT infrastructure transitions, ERP migrations and large-scale organisational transformations in sectors where disruption has immediate operational consequences — healthcare, aviation, energy, defence, logistics and financial services.

And when things go wrong — as they sometimes do — I stay, think clearly, and solve the problem. That has put me in situations I did not anticipate. Aircraft grounded. A burning university. A screaming board member who needed to leave the room. A national COVID laboratory built from scratch in six weeks. Eight had been requested.

I am not a crisis manager by profession. I am a programme director who does not leave when it gets difficult.

You call me when the plan has already failed
and the deadline has not moved.

These are not hypothetical. Click each situation to read the outcome.

Martinair
Datacentre migration failure. All aircraft grounded.
Result
Deployed as crisis lead. Migration completed. Aircraft operations restored within the recovery window.
ABN AMRO
Client halted the server migration programme. Board member in the room, shouting, trying to direct the team himself.
Result
One captain. Room cleared. 120 servers migrated within the original client planning.
TU Delft — 13 May 2008
Faculty of Architecture destroyed by fire. 13 floors. Partially collapsed. 3,500 students without a building. Minister called it "the biggest disaster in Dutch university history."
Result
IT infrastructure rebuilt in 2 weeks. Tents erected and connected to the internet. Lectures resumed on schedule.
Eurofins COVID HVL
National COVID laboratory needed from scratch. Zero Trust IT/OT. 65,000 samples per day. 8 weeks requested. Small team. Requirements changing daily.
Result
Delivered in 6 weeks — 2 weeks ahead of deadline. Operational from day one under full national load. No outages.
ECT Port of Rotterdam
System error placed empty containers in full-container inventory. Customs exposure imminent. Director screaming, demanding to know who was responsible.
Result
"It is your terminal but my project — I will give you an update in 20 minutes." Problem resolved. No customs incident.
NS Dutch Railways — Snow Weekends
Two consecutive snow weekends. Passengers stranded. Buses unavailable. Simultaneous DDoS on NS.nl. NS board threatening to name KPN on the 20:00 national news.
Result
"I'll walk with you — and explain that we are still investigating and no one benefits from speculation tonight." Board stood down. Services restored. KPN stayed off the news.
Zuyderland Medical Centre
€12M SAP in a live hospital — taken over mid-delivery after escalation. Regional power failure hits Limburg. The veiligheidsdriehoek was preparing to evacuate the outpatient clinic and the operating theatres. Had that happened: front page of De Telegraaf.
Result
Clinical operations never stopped. Evacuation did not happen. Programme delivered within the 15-month plan.
Thermphos / Rhodia — River Mersey
Chemical plant acquisition, Oldbury & Widnes UK. One migration weekend. Enough phosphorus in the supply chain to contaminate the River Mersey for decades. Storm arrived. Portacabin shaking. Fire service appeared uninvited.
Result
Friday in. Monday morning home. SAP live. No environmental incident. No safety incident.
Prinses Máxima Centrum
Programme severely behind schedule. Deadline unmovable: seriously ill children would walk across the bridge from UMC on that exact date.
Result
KPN board brought on-site. Long days. Every deliverable driven to the line. Deadline met. Children crossed the bridge.
RWS Cambiar — AGI Delft
Entire office evacuating. Working alone on the 5th floor. Security guard arrived out of breath: "There is a fire. You must come NOW." No smoke. No alarm. No flames visible.
Result
"When it is truly unsafe, the fire service will come and get us." An hour later, a firefighter put his head through the door. Work completed. Roof was indeed on fire.
ProgrammeScopeResult
Eurofins HVLZero Trust IT/OT · 65,000 samples/day · national healthcare · small team6 weeks — asked for 8. Day one operational.
TU Delft 2008Faculty destroyed by fire · 3,500 students · total rebuild2 weeks. Tents. Online. Lectures on schedule.
KPN IS&P → Spie600 FTE carve-out · Oracle → Dynamics ERP · live businessWithin timeline. No service interruption.
Zuyderland MC€12M SAP · live hospital · crisis takeoverStabilised and delivered. Hospital never stopped.
Prinses MáximaProgramme behind · unmovable human deadlineDeadline met. Children crossed the bridge.
ABN AMROMigration halted · 120 servers · client in panicRoom cleared. 120 servers. Original planning.
ING Trimaran€45M+ global outsourcing · NL, BE, CH, JP, MXFMO across 5 countries. On scope and schedule.
Akzo Nobel7,000 workplaces · 220 locations · 6 continents · Hurricane Rita6 months. All locations. Zero outage.
NS Railways€42M account · 121 FTE · snow crises + DDoSServices stabilised. SLA maintained.
Thermphos UKSAP · chemical plant · one weekend · stormFriday in. Monday home. Live. No incident.
MillenniumFokker Services + ECT · hard deadline 1 Jan 2000Both live on time. No Y2K incident.
Senior Consultant
2024 — 2025
Classified · Vital Sector
NDA — details on request ↓

Classified assignments in critical infrastructure. Details available upon request under NDA.

Unit Manager (Classified)
Jul 2024 — Jul 2025
Hudson Cybertec — a Kiwa Company
Click to expand ↓

Classified OT/ICS security assignments in critical operational environments.

Director Business Security
Oct 2021 — Aug 2024
Cubics ICT BV
Click to expand ↓

Full executive accountability for the organisation's security posture. Built from scratch.

SIEM/SOC platform (C-Fence) with AI-assisted incident response
ABDO-compliant service delivery structure and programme governance
NIS2: risk management, incident reporting, supply chain accountability
Penetration testing, MDM security, cyber risk assessment
Programme Manager
Sep 2020 — Oct 2021
Capgemini · Eurofins COVID HVL, Rijswijk
Click to expand ↓

National COVID High Volume Laboratory. The most operationally pressured environment of 2020.

Zero Trust IT/OT from scratch · 65,000 samples/day · 24/7 · no outages permitted
Delivered in 6 weeks — 8 weeks had been requested
Small team. Requirements shifting daily. Operational from day one.
Programme Manager
Sep 2019 — Sep 2020
AVR — Energy & Waste Processing
Click to expand ↓
Disaster Recovery programme across OT/IT infrastructure
Predix APM module implementation for turbine operations, Rozenburg
Programme Director · Director Operations
2011 — 2019
KPN Corporate & Enterprise Market
Click to expand ↓

Eight years. Multiple executive mandates. The programmes KPN could not afford to lose.

Director Operations — 121 FTE, 12 direct reports · NS Dutch Railways €42M annual contract
ABDO-compliant IT service delivery for Dutch Defensie domain — built from scratch
Zuyderland Medical Centre — €12M SAP crisis takeover, delivered within 15-month plan
Prinses Máxima Centrum — programme recovered, deadline met
KPN IS&P → Spie — 600 FTE carve-out, Oracle → Dynamics ERP
Ministry of Defence: Unified Communications, ABDO-compliant programmes
NS snow crisis + DDoS — services stabilised, board kept off the 20:00 news
Business Director
Aug 2009 — Mar 2011
KPN Client Services & Support
Click to expand ↓

23 direct reports. Three crisis interventions in one role. All recovered.

Martinair — aircraft grounded · Essent — service disrupted · ABN AMRO — migration halted
Contractual performance recovery across KPN/Getronics delivery organisation
Runrate €1.2M · reporting to COO
Global Transition & Programme Leadership
2005 — 2009
Getronics · ING · Philips · Port of Rotterdam
Click to expand ↓
ING Trimaran — €45M+ global outsourcing · FMO across NL, BE, CH, JP, MX
Philips — global IT transition · €1.2M · multiple continents
Port of Rotterdam — €5M outsourcing · P&L responsibility · ECT crisis resolved
Due diligence: Swiss Re Zürich · Ministry of Education Singapore
Project Manager
1998 — 2005
Atos Origin · ECT · ENECO · Fokker Services
Click to expand ↓
Akzo Nobel — 7,000 workplaces, 220 locations, 6 continents, 6 months · Hurricane Rita evacuation
Thermphos / Rhodia — SAP go-live, chemical plant, one weekend, storm · no incident
TU Delft 2008 — faculty destroyed, IT rebuilt in 2 weeks including tents
Millennium — Fokker Services and ECT both live 1 January 2000
RWS Cambiar — worked through building evacuation, roof on fire, programme delivered

Stichting
Hoogvliegers

Volunteer pilot since 2011. Stichting Hoogvliegers gives seriously ill children the experience of flying as co-pilot in a small aircraft. For thirteen years I have been one of those pilots.

Controlled airspace. ATC radio. Navigation. Weather decisions. And beside me: a child whose condition I cannot predict, whose reaction I cannot rehearse, and whose day depends entirely on what I do next.

It requires the same thing my work does:
stay calm, take responsibility,
and keep flying.

Security

CISSP · CISM · CISA · CEH · CHFI
Certified Security Professional (Cqure)
Certified Associate Zscaler

Programme Management

Prince2 Practitioner · MSP · ITIL
PMBoK · Six Sigma Greenbelt
KPN Academy

Aviation

JAA FCL PPL(A) Private Pilot Licence
UAS Remote Pilot A1+A3 & A2
TCAS ATC-I-TCAS (Eurocontrol 2025)

AI & Data — MIT 2025

Machine Learning · AI & Algorithms
Artificial Intelligence
Computational Thinking & Data Science

Education

HEAO Business Management Informatics
HES Rotterdam
Dutch Law (2.5y) · Open University

Availability

Maastricht, The Netherlands
Available within 1 hour
Open to international responsibility

Available for executive roles
and complex interim mandates.

Critical infrastructure · within an hour of Maastricht · open to international programme responsibility